The NEC4 Engineering and Construction Contract (ECC) Option A is a widely used contract option in the construction industry. It is characterized as a priced main works contract with an activity schedule. This structure offers distinct advantages for both clients and contractors, fostering a collaborative environment and promoting effective project management.

Key Highlights of NEC4 Option A Benefits

  • Clear Pricing and Payment Structure: Option A utilizes an activity schedule with allocated prices, simplifying interim payments based on the completion of defined activities.
  • Suitable for Straightforward Projects: This option is particularly well-suited for projects with a clearly defined scope and minimal anticipated changes, such as new builds.
  • Contractor Incentives for Efficiency: The priced nature of the contract incentivizes the contractor to manage their activities efficiently to maximize their opportunity for benefit.

Understanding the Foundation: What is NEC4 Option A?

NEC4 Option A, a component of the NEC4 suite of contracts, is a priced contract that relies on an activity schedule. In this setup, each activity listed in the schedule is assigned a specific price. Interim payments to the contractor are then directly linked to the completion of these defined activities. This creates a clear and transparent payment process throughout the project lifecycle.

The NEC4 suite, an evolution of the NEC3, was published in 2017, incorporating feedback and aiming to enhance clarity, flexibility, and collaborative working. Option A is often described as NEC's equivalent of a lump-sum contract, where the contractor prices the cost of carrying out the works. The financial risk for completing the activities at the agreed-upon prices largely rests with the contractor under this option.

The Role of the Activity Schedule

A central element of NEC4 Option A is the activity schedule. This schedule breaks down the project into a series of distinct activities, each with an agreed price. The use of an activity schedule simplifies the administration of interim payments, as payment is triggered by the completion of scheduled activities rather than detailed measurement of work in progress. The activity schedule, along with a contract programme, is typically submitted as part of the tender process.

Core Benefits of Utilizing NEC4 Option A

NEC4 Option A offers several compelling advantages that contribute to successful project delivery. These benefits stem from its structure, emphasis on clarity, and risk allocation.

Enhanced Cost Certainty and Control

For clients, one of the primary benefits of NEC4 Option A is the high degree of cost certainty it provides. With a priced activity schedule, the overall cost of the project is largely fixed upfront, assuming the scope remains within the defined activities. This allows clients to manage their budgets effectively and minimizes the risk of unexpected cost overruns.

While the contractor bears the majority of the financial risk, their pricing of the activities reflects their assessment of the cost to complete the work. This encourages careful planning and execution by the contractor.

Simplified Payment Administration

The payment process under NEC4 Option A is streamlined due to its reliance on the activity schedule. Interim payments are made upon the completion of scheduled activities, which is generally easier to assess than measuring partially completed work or detailed cost components. This simplified administration benefits both the client and the contractor, reducing administrative burden and potential for disputes over payment valuations.

Clear Risk Allocation

NEC4 Option A provides a clear allocation of financial risk. The contractor primarily assumes the risk associated with carrying out the activities at the agreed prices. This clarity helps both parties understand their responsibilities and potential exposures from the outset of the project.

Incentive for Contractor Efficiency

Under a priced contract like Option A, the contractor has a strong incentive to perform the work efficiently. By completing activities within or below the allocated price, the contractor can increase their profit margin. This aligns the contractor's financial interests with efficient project delivery.

NEC4 Engineering and Construction Contract cover

The NEC4 Engineering and Construction Contract is the foundation for Option A.

Promoting Collaboration and Early Warning

Like all NEC4 contracts, Option A is built on the principle of fostering a "spirit of mutual trust and co-operation" between the parties. The contract includes provisions for early warning notices, requiring both the client and the contractor to notify each other of any potential issues that could affect time, cost, or quality. This proactive approach allows potential problems to be addressed collaboratively and mitigated before they escalate into major disputes.

Suitability for Defined Scope Projects

NEC4 Option A is particularly well-suited for projects where the scope of work is clearly defined and there is a low expectation of significant changes during the construction period. New build projects and other straightforward ventures with minimal risks often benefit from the certainty and simplicity offered by Option A.


Comparing NEC4 Option A with Other Options

The NEC4 suite offers various main options to cater to different project needs and risk profiles. Understanding the differences between Option A and other common options, such as Option C (Target Contract with Activity Schedule), helps in selecting the most appropriate contract for a given project.

Option A vs. Option C

While both Option A and Option C utilize an activity schedule, their pricing mechanisms and risk-sharing arrangements differ significantly. Option A is a priced contract with the contractor bearing the majority of the financial risk. Option C, on the other hand, is a target cost contract where the financial risk and gain are shared between the client and the contractor based on achieving a predefined target cost.

Option A is generally preferred for straightforward projects with minimal anticipated changes, while Option C is more suitable for medium to major valued works that require effective collaboration and risk management due to a higher likelihood of change or uncertainty.

Other NEC4 Options

Other NEC4 main options include:

  • Option B: Priced Contract with Bill of Quantities. Similar to Option A but uses a Bill of Quantities instead of an activity schedule for pricing.
  • Option D: Target Contract with Bill of Quantities. A target cost contract linked to a Bill of Quantities.
  • Option E: Cost Reimbursable Contract. The contractor is reimbursed for their actual costs plus a fee. This option is used when the scope is highly uncertain.
  • Option F: Management Contract. The contractor manages the works but does not directly carry out the construction.

The choice of NEC4 option depends on factors such as the level of design completion, the certainty of the scope, the desired risk allocation, and the client's objectives.


Key Features and Mechanisms in NEC4 Option A

Beyond the core pricing and payment structure, NEC4 Option A incorporates several key features and mechanisms that contribute to its effectiveness.

Compensation Events

NEC4 contracts, including Option A, include a process for dealing with compensation events. These are events that entitle the contractor to changes in the prices, the Completion Date, or both. While Option A aims for minimal changes, the compensation event mechanism provides a fair and defined process for assessing the impact of unforeseen events or client-instructed changes.

Under NEC4 Option A, the assessment of compensation events utilizes the short schedule of cost components, which adopts a pre-priced approach for people costs, replacing the previous cost-based approach used in NEC3 for compensation events under Option A.

Programme Management

Maintaining an updated and agreed programme is crucial in NEC4 contracts. The programme details the planned sequence and timing of the activities. Under Option A, the programme is linked to the activity schedule and provides a basis for assessing progress and the impact of compensation events on the Completion Date.

Risk Management

While Option A allocates the majority of financial risk to the contractor, the contract's emphasis on early warning and collaborative problem-solving facilitates proactive risk management. Identifying and addressing potential risks early helps to mitigate their impact on the project's time, cost, and quality.


Situations Where NEC4 Option A Excels

Given its characteristics, NEC4 Option A is particularly well-suited for certain types of projects and procurement strategies.

Straightforward New Builds

Projects involving the construction of new buildings with a clearly defined design and scope are ideal candidates for NEC4 Option A. The predictable nature of the work aligns well with the priced activity schedule approach.

Projects with Minimal Anticipated Changes

When the client is confident that the project scope is unlikely to undergo significant changes during construction, Option A provides cost certainty and a straightforward contractual framework.

Situations Requiring Simplified Payment

For clients and contractors who prioritize a simple and easy-to-administer payment process, Option A's reliance on the completion of scheduled activities is a significant advantage.


Considerations When Using NEC4 Option A

While NEC4 Option A offers numerous benefits, it is important to consider its limitations and potential challenges.

Suitability for Complex Projects

NEC4 Option A may not be the most appropriate choice for highly complex projects with uncertain scope or a high probability of significant changes. In such cases, a target cost or cost reimbursable contract might be more suitable to manage the increased risks and uncertainties.

Managing Scope Changes

While the compensation event mechanism exists to handle changes, extensive or frequent changes in scope can be more challenging to manage under a priced contract like Option A compared to a target cost option where there is more flexibility to adjust the target cost.


The Evolution from NEC3 to NEC4 and its Impact on Option A

The transition from NEC3 to NEC4 brought about several changes that refined and improved the contractual framework, including for Option A.

Simplified Fee Percentage

NEC4 introduced a single "fee percentage" for assessing cost, simplifying the previous approach in NEC3 which had multiple fee percentages. This change affects how compensation events are valued under Option A when using the short schedule of cost components.

Short Schedule of Cost Components

As mentioned earlier, NEC4 standardized the use of the short schedule of cost components for assessing compensation events under Option A, moving towards a pre-priced approach for people costs.

Emphasis on Clarity and Commonality

A key theme in NEC4 is enhancing clarity and commonality across the contract suite. This aim to minimize confusion and disputes is reflected in the drafting of Option A and its associated clauses.


Summary Table of NEC4 Option A Characteristics

The following table summarizes the key characteristics of NEC4 Option A:

Feature Description
Pricing Mechanism Priced Contract with Activity Schedule
Payment Basis Interim payments upon completion of scheduled activities
Risk Allocation (Financial) Largely borne by the Contractor
Suitability Straightforward projects, new builds, minimal anticipated changes
Compensation Event Assessment Uses the short schedule of cost components (pre-priced people costs)
Emphasis Cost certainty, simplified payment, contractor efficiency, collaboration

Real-World Application and Success

NEC contracts, including Option A, have been successfully used on a wide range of projects globally. The framework's emphasis on clear communication, proactive management, and collaborative problem-solving contributes to positive project outcomes.

Promoting Good Project Management

The structure and procedures within NEC4 Option A encourage good project management practices. Requirements for maintaining a programme, issuing early warnings, and following defined processes for compensation events instill discipline and help project teams stay on track.


Frequently Asked Questions about NEC4 Option A

What is the main difference between NEC4 Option A and Option C?

The main difference lies in the pricing and risk allocation. Option A is a priced contract with contractor bearing most financial risk, while Option C is a target cost contract with shared financial risk and gain.

When should I choose NEC4 Option A for my project?

NEC4 Option A is best suited for straightforward projects with a well-defined scope, minimal expected changes, and where cost certainty is a high priority for the client.

How are payments made under NEC4 Option A?

Interim payments are made based on the completion of activities listed in the agreed activity schedule, each with a predefined price.

Does NEC4 Option A allow for design?

Yes, NEC4 Option A can include any level of design responsibility as agreed between the parties.

How does NEC4 Option A handle changes in scope?

Changes in scope are managed through the compensation event process, which allows for adjustments to the prices and programme based on the defined contractual procedures.


This video provides a comparison between NEC3 and NEC4 Option A, highlighting key changes and considerations for the priced contract with activity schedule.